AU 54 HACMP PDF

used to implement HACMP in a virtualized environment and to plan for, configure and following course (or equivalent experience): AU HACMP System. This edition applies to HACMP for AIX and HACMP/Enhanced Scalability ( HACMP/ES), Program. Number expected to have completed the course AU /usr/lpp/doc/release_notes IBM courses: HACMP Administration I: Implementation (AU54) HACMP Administration II: Maintenance and Migration ( AU57) HACMP.

Author: Meztikree Zulukree
Country: Denmark
Language: English (Spanish)
Genre: Automotive
Published (Last): 2 April 2017
Pages: 261
PDF File Size: 14.22 Mb
ePub File Size: 6.65 Mb
ISBN: 887-6-49262-228-6
Downloads: 94821
Price: Free* [*Free Regsitration Required]
Uploader: Goltikazahn

The first field is mandatory as it ask about the controller name. Sign in or register to add and subscribe to comments. Second field is to add start script and third field is to add stop script. Assume that there is an application which is at home directory in hhacmp and we need to make that application highly available with PowerHA.

Au54 Hacmp System Administration I

Here, applications and file system will be added to resource group RG1. After starting the cluster services, due to wrong input into script it will keep on restarting application controller because of restart count.

An application will not be able to stabilize with that wrong path in above mentioned script. Therefore, in this case application app1 is failed because of the wrong path mentioned for an application in the start script. An application will be added to resource group under a volume ua and a file system will be created on it. Subscribe me to comment notifications. Businesses Deliverables Maturity Date Encryptions Encryption summary document Between 5 and 10 encryptions per month in collaboration with 1 permanent member of the team Assistance to, and reporting on the committees’ technical capacity Adjustment recommendations to adapt production resources by application 1 committee per month alternatively Pseries and HyperV Assistance provided for 5 working days before the committee Summary sent 3 business days yacmp the committee meeting Optimisations Records specifying the proposed optimisations and the expected gains Forecasts Monthly capacity plan Prior to the 15th day of the following month Managed incidents for various clients, implemented performance indicators on the system.

  AVAYA IP OFFICE CCR PDF

Customer can get a cluster to a stable state and a resource group to an accessible state after rectifying the wrong input to their resources.

So there will be an application controller start,stop script, and also monitor script to monitor hcmp in a cluster. Application under that Resource group is also not started.

PowerHA provides feature that allows a cluster to come into stable state and resource active as per the policy after correcting wrong input without stopping the cluster services. To understand this with application failure, we will change the path for application in start scripts on all the nodes.

The following section describes how to enter the parameters shown in Figure 3, while creating an application monitor. X and Toad o Approved technical solutions proposed by suppliers.

This article explains how to use the IBM PowerHA SystemMirror feature to get a cluster into stable state in case of any applications or resource failure due to wrong input without stopping cluster services. An application controller name is user defined. Therefore, a cluster recovery from script failure will get cluster to proper state and EVENT will be completed in hacmp. Proposed the implementation of optimisations to limit the cost of Infras while guaranteeing the level of service requested by different business networks.

RG1 is nonconcurrent resource group and other 2 resource groups are concurrent groups. There are chances, that due to wrong input in resource or applications, cluster might not come to stable state and resource group might go to error state.

AU54 – HACMP System Administration I – Planning and Implementation

Similarly more than two nodes cluster can be created along with Site separation based on repository disk. Deliverables for each business are described in the table yacmp. If a script is failed because of the wrong input to PowerHA, the Cluster Manager will report failure in hacmp. User need to manually change the wrong input after seeing error in to hacmp.

  INTRODUCTION TO ATTIC GREEK DONALD J MASTRONARDE PDF

So, in that case resource group has to be brought ONLINE manually after rectifying the wrong input on all nodes, where as if resource group is in ERROR state on one node, recovering from cluster script failure can get it to proper state after correcting wrong input.

If resource group on all the nodes go to ERROR state that means wrong input is there on all the nodes.

Recovering from a resource failure in IBM PowerHA cluster

This article explains about configuring base PowerHA cluster with two nodes. This will ask for which resource group to be selected to add applications and file system to it. Site based cluster can be stretched cluster or linked cluster, stretched cluster is at same location where as linked cluster is configured where data centers are at different geographical locations.

This will allow cluster to get stable on that nodes and if script is correct resource group will come online on that node. Established a monthly 45 plan. This article can help users to get recovery from cluster failure due to failure in a resource or application caused by the wrong input. If there is wrong path in script only on one node, resource group will try to come ONLINE on that particular node but after completing 3 restart count it will fall over to next node as per restart count set in Figure 3if next node has everything correct in application then cluster will be stable and resource group will come online aau that node.

Comments Sign in or register to add and subscribe to comments.